In response to California ISO’s grid resilience initiative, this is one of the first-of-its-kind projects to retrofit two existing natural gas plants with Battery Energy Storage Systems (BESS). This innovative approach aims to provide crucial black start capability, enhancing grid stability and rapid power restoration during outages.
We oversaw all engineering aspects of the retrofit, ensuring the seamless integration of BESS with the existing natural gas plants.
As Owner’s Engineer, we navigated the technical challenges of combining conventional gas plants with cutting-edge battery storage technology.
We provided expert commissioning oversight and testing, crucial for validating the performance and reliability of the hybrid system.
Our expertise ensured the project met all California ISO requirements and grid codes, setting a new standard for hybrid power systems.
This project exemplifies the cutting-edge solutions needed to meet evolving grid reliability challenges. By successfully integrating BESS with conventional gas plants, FastGrid demonstrated its ability to implement complex, hybrid energy systems, contributing significantly to power infrastructure modernization.